Instalation has begun

16.01.23 | film group – blog by Yang Hanzhang 杨汉章 (student, SZU)

Today is the final day, and all the members of the workshop met at the factory this morning. All the film group’s members, except Stephen, followed the design group to the pavilion for the time lapse shooting of the installing of the tubes. We got some great shots of how the tubes link to the stainless steel rings and are hung. Stephen had to stay at the factory for some work on the text for the installation.
The film is looking great!! We have two short ones: one tells the story of the factory and the fabrication process. The other is more focused on how the students exchange ideas and worked with workers on the design and making of the installation.